+
Info -
Info
Info -
Info
public building
Vall d’Hebron / Horta Guinardo
Year: 2021
Lead Architect:
Maria Díaz
Project Team:
Iosune Martin
Training tower for the Fire Station
The proposal features a training tower that seamlessly integrates into its surroundings thanks to its lightweight materials and permeable volume. The project is based on the superimposition of three staircase types and two self-supporting skins that create interconnected, naturally lit pathways, forming a central and a perimeter space linked together.
The tower is constructed with a ceramic lattice that filters light, provides transparency, and ensures durability under heavy use. At night, its interior lighting transforms it into a visual landmark.
The prefabricated modules allow for functional flexibility, future adaptability, and rapid construction with minimal disruption to the Fire Station.
The tower is constructed with a ceramic lattice that filters light, provides transparency, and ensures durability under heavy use. At night, its interior lighting transforms it into a visual landmark.
The prefabricated modules allow for functional flexibility, future adaptability, and rapid construction with minimal disruption to the Fire Station.