MDBA_BEGO project
MDBA_BEGO project
Arrow Prev
Arrow Next

public building

Leioa / Vizcaya

Year: 2024

Project:

private

Client:

private

Lead Architect:

Maria Diaz

Project Team:

Iosune Martin

Student residence in Campus Leioa

On the Leioa campus, the student residence emerges as two parallel volums, embracing a green clearing where campus life quietly expands.

The façades, in shimmering aluminium, open into generous voids that echo the calm strength of Bilbao’s old steel factories: deep light, industrial rhythm, memory reimagined.